The objective was to study the consequences of beam line shutter placement on the serviceability of neutron instruments. All instruments in the reference suite were simply modelled at the components level and the conditions for access to components during neutron production were evaluated. Modifications to the levels of serviceability of instruments with each configuration of beam line shutter were examined in order to establish the relative performance of each solution.