ESS Docs Document 215-v1

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

SNS Project Completion Report

Document #:
ESS-doc-215-v1
Document type:
Other
Submitted by:
Garry Trahern
Updated by:
Garry Trahern
Document Created:
24 Jul 2012, 11:21
Contents Revised:
24 Jul 2012, 11:21
Metadata Revised:
24 Jul 2012, 11:21
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Abstract:
The goal of the Spallation Neutron Source (SNS) project was to design, construct, and commission into operation an accelerator-based, pulsed neutron research facility for studies of the structure and dynamics of materials that is substantially better than any other facility in the world. Key requirements, captured in the Level-0 baseline, were to complete a facility capable of >1 MW at a total project cost of $1,411.7M by the end of June 2006. This goal has been not only achieved but exceeded. The SNS construction project was completed in May 2006 at an estimate at completion (EAC) of $1,405.2, meeting all of its performance milestones with a scope that exceeds what was originally envisaged at the time the project was approved.
Files in Document:
Keywords:
SNS
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Document Database Administrators