307-v2 |
ESS Design Manual |
Steve Peggs |
SCRF
ESS General
Controls
Beam Instrumentation
Vacuum
Beam Physics
ES&H
NCRF
RF
LLRF
Cryogenics
|
08 Nov 2013 |
300-v1 |
Loaded Q Calculations for the ESS High Beta Linac |
David McGinnis |
SCRF
|
05 Sep 2013 |
297-v1 |
Loaded Q Calculations for the ESS Spoke Linac |
David McGinnis |
SCRF
|
26 Aug 2013 |
295-v1 |
Loaded Q Calculations for the ESS Superconducting RF Linac |
David McGinnis |
SCRF
|
13 Aug 2013 |
274-v15 |
ESS Technical Design Report |
Steve Peggs |
SCRF
ESS General
Controls
Beam Instrumentation
Vacuum
Beam Physics
ES&H
NCRF
RF
LLRF
Cryogenics
|
27 Jun 2013 |
280-v1 |
Comparison of 5- & 6-cell Medium-B Linac based on the Nearest Passband Mode |
Mohammad Eshraqi et al. |
SCRF
Beam Physics
|
05 Jun 2013 |
252-v1 |
The RF Power Consumption in the ESS Spoke Linac |
Vitaliy Goryashko et al. |
SCRF
|
05 Feb 2013 |
218-v1 |
Medium Beta Elliptical Cavity-Cryomodule Technology Demonstrator |
Christine Darve et al. |
SCRF
ESS General
Cryogenics
|
15 Aug 2012 |
209-v1 |
Same Order Modes (SOMs) |
Robert Ainsworth |
SCRF
Beam Physics
|
12 Jun 2012 |
192-v1 |
Transient cavity studies |
Stephen Molloy |
SCRF
|
13 Apr 2012 |
162-v2 |
Linac power optimisation including beam-velocity effects |
Stephen Molloy |
SCRF
|
25 Jan 2012 |
161-v2 |
Steady-state calculations for SC cavities |
Stephen Molloy |
SCRF
|
24 Jan 2012 |
159-v1 |
Splitting the medium beta section |
Stephen Molloy |
SCRF
|
04 Jan 2012 |
152-v1 |
Optimising high-power input couplers |
Stephen Molloy |
SCRF
|
22 Nov 2011 |
144-v1 |
CW SRF Systems with Ingot Niobium and Their Applications |
Ganapati Myneni |
SCRF
|
09 Nov 2011 |
138-v1 |
Recommendation on Studies Regarding the Installation of HOM Couplers |
Stephen Molloy |
SCRF
|
27 Oct 2011 |
136-v1 |
Recommendation on studies regarding the installation of HOM couplers |
Stephen Molloy |
SCRF
|
17 Oct 2011 |
127-v1 |
Conclusions from RF/HOMs Workshop (22nd, 23rd September 2011) |
Stephen Molloy |
SCRF
|
26 Sep 2011 |
103-v1 |
Report from RF Power Workshop |
Karin Rathsman et al. |
SCRF
|
13 Sep 2011 |
115-v1 |
Multipacting Analysis for the Superconducting RF Cavity HOM Couplers in ESS |
Robert Ainsworth et al. |
SCRF
|
12 Sep 2011 |
96-v1 |
ESS and RF power source |
Karin Rathsman |
SCRF
ESS General
|
15 Jun 2011 |
87-v2 |
Quantifying the risk due to HOMs |
Stephen Molloy |
SCRF
|
01 Jun 2011 |
92-v2 |
An Empircal Study of HOM Frequencies |
Stephen Molloy |
SCRF
|
23 May 2011 |
91-v1 |
RF Power Calculations for High Beta Elliptical Cavities |
Karin Rathsman |
SCRF
|
23 May 2011 |
90-v1 |
RF cavity studies at RHUL,l Simulations & measurement |
Robert Ainsworth |
SCRF
|
20 May 2011 |
68-v1 |
Conclusions from the HOM studies performed by M. Schuh |
Stephen Molloy |
SCRF
|
26 Apr 2011 |
32-v1 |
ESS: EM Fields & SC Cavities in Particle Accelerators |
Stephen Molloy |
SCRF
Beam Physics
|
07 Mar 2011 |