335-v1 |
Perturbation Analysis for DTL Field Control |
Rihua Zeng |
RF
|
19 Jun 2014 |
334-v1 |
Perturbation Analysis for Spoke Cavity Field Control |
Rihua Zeng |
RF
|
19 Jun 2014 |
333-v2 |
Cavity Sorting at ESS |
Emanuele Laface et al. |
RF
Beam Physics
|
12 Jun 2014 |
298-v1 |
Field Stability Issue for Normal Conducting Cavity under Beam Loading |
Rihua Zeng |
NCRF
|
28 Aug 2013 |
263-v1 |
Power Overhead Reduction Considerations for RF Field Control in Beam Commissioning |
Rihua Zeng |
RF
|
14 Mar 2013 |
253-v1 |
Design Considerations for Phase Reference Distribution |
Rihua Zeng et al. |
RF
|
11 Feb 2013 |
244-v1 |
Some Calculation on Power Overhead in ESS High Beta Cavity Control |
Rihua Zeng |
RF
|
28 Nov 2012 |
206-v1 |
The ESS LLRF Control System |
Rihua Zeng |
LLRF
|
04 Jun 2012 |
205-v2 |
Investigation of Feedback Control for Klystron Ripple_IPAC12 Paper |
Anders J Johansson et al. |
LLRF
|
04 Jun 2012 |
204-v1 |
Control Performance Improvement by Using Feedforward in LLRF_IPAC12 Paper |
Anders J Johansson et al. |
LLRF
|
04 Jun 2012 |
187-v1 |
Power Overhead Calculation for Lorentz Force Detuning_talk |
Rihua Zeng |
LLRF
|
26 Mar 2012 |
119-v1 |
THE RF POWER SOURCE FOR THE HIGH BETA ELLIPTICAL CAVITIES OF THE ESS LINAC |
Karin Rathsman et al. |
RF
|
14 Mar 2012 |
184-v1 |
Power Overhead Calculation for Lorentz Force Detuning |
Rihua Zeng |
LLRF
|
09 Mar 2012 |
176-v1 |
Some Considerations on Predetuning for Superconducting Cavity |
Stephen Molloy et al. |
LLRF
|
27 Feb 2012 |
177-v1 |
Influence of the Droop and Ripple of Modulator on Klystron Output |
Anders J Johansson et al. |
RF
|
27 Feb 2012 |
175-v1 |
Influence of the Droop and Ripple of Modulator on Klystron Output |
Anders J Johansson et al. |
LLRF
|
23 Feb 2012 |
174-v1 |
Some Considerations on Predetuning for Superconducting Cavity |
Stephen Molloy et al. |
LLRF
|
23 Feb 2012 |
173-v1 |
Influence of the Droop and Ripple of Modulator on Klystron Output |
Anders J Johansson et al. |
LLRF
|
23 Feb 2012 |
157-v2 |
An Introduction to LLRF Control |
Rihua Zeng |
LLRF
|
03 Feb 2012 |
137-v1 |
LLRF Requirement and parameters at ESS_LLRF wokshop talk |
Anders J Johansson et al. |
LLRF
|
21 Oct 2011 |
103-v1 |
Report from RF Power Workshop |
Karin Rathsman et al. |
SCRF
|
13 Sep 2011 |
117-v1 |
Challenges for the Low Level RF Design for ESS-Poster |
Anders J Johansson et al. |
LLRF
|
12 Sep 2011 |
116-v1 |
Challenges for the Low Level RF Design for ESS |
Anders J Johansson et al. |
LLRF
|
12 Sep 2011 |
109-v1 |
RF Modeling Plans for the European Spallation Source |
Robert Ainsworth et al. |
RF
|
12 Sep 2011 |
104-v1 |
Power Requirements for High beta Elliptical Cavities |
Rihua Zeng |
LLRF
|
13 Jul 2011 |
50-v1 |
LLRF Overview and Development in Other Labs |
Rihua Zeng |
LLRF
|
04 Apr 2011 |
29-v1 |
LLRF Study on RF Power Requirement |
Rihua Zeng |
RF
|
04 Feb 2011 |