ESS Docs Document 283-v1

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Report on the implication of Shutter placement on the RAS on neutron instrument at ESS.

Document #:
ESS-doc-283-v1
Document type:
Study Report
Submitted by:
Phillip M Bentley
Updated by:
Phillip M Bentley
Document Created:
17 Jun 2013, 20:34
Contents Revised:
17 Jun 2013, 20:34
DB Info Revised:
17 Jun 2013, 20:34
Viewable by:
  • Public document
Modifiable by:
Abstract:
The objective was to study the consequences of beam line shutter placement on the serviceability of neutron instruments. All instruments in the reference suite were simply modelled at the components level and the conditions for access to components during neutron production were evaluated. Modifications to the levels of serviceability of instruments with each configuration of beam line shutter were examined in order to establish the relative performance of each solution.